1958

April 1958, s1_008
From the slide set description: 2-6-0 #25 with a local freight rounds the high bridge on Sims Loop which passes over spectacular Grandt Cliff. The year is…
April 1958, s1_009
From the slide set description: High above French Gulch at the town of Akin, gas-electric #60 stops to unload. (hi-res raw version)
April 1958, s1_010
From the slide set description: Taylor Lake in April of 1959 showing completed construction near Devil’s Gulch. (hi-res raw version)
April 1958, s1_011
From the slide set description: Below the Butler Mine at Angels Camp high above French Gulch, 4-10-0 #34 eases out of one of the G&D’s many tunnels. The yet to…
April 1958, s1_016
From the slide set description: With a string of stock cars, 4-10-0 #34 is about to plunge into a short rock-lined tunnel blasted through Devil’s Post Pile. The…
April 1958, s2_002
From the slide set description: 2-4-0T #3 of the Devil’s Gulch & Helengon drifts towards Helengon with six cars. 4-58 (hi-res raw version)
April 1958, s2_013
From the slide set description: 4-10-0 #34 rumbles across the Warren truss bridge at Port. 4-58 (hi-res raw version)
April 1958, s0_009
GDRP comment: Freight train entering Gorre, eastbound around Devils Post Pile. Determined to be April 1958 due to the sparsity of pine trees and the presence of…
April 1958, s0_014
GDRP comment: Scalp Mountain, looking at Robinson Cliff. Giant Canyon taking shape. Sim’s loop appears complete. Nika can be seen above (Akin in the mirror).…
April 1958, s0_015
GDRP comment: The area of future Port Plastics - now the bridge is in, though no trusses yet. (hi-res raw version)
April 1958, s0_016
GDRP comment: The main line west of Great Divide on the bridge above the rock bunker at Port. (hi-res raw version)
April 1958, s0_018
GDRP comment: Sim’s Loop tunnel and the small bridge. Note Emma, #13, is also at work. Butler Mine is yet to be installed. (hi-res raw version)