HOME  »  Gorre and Daphetid Railroad - The Slides » Set_01 »  Viewing s1_035_25bridge_feb72     [Image 35 of 41]  :: Jump To  
  First slide Previous slide      Index Page Start/Stop the slide show      Next slide Last slide  
Comment: 2-6-0 #25 approaches the last bridge John Allen built, the Scalp Mountain Arch over Squawbottom, in February 1972.
s1_030_linnsarchives_sep69 * Shay #7 shoves a flat full of rail past Andrews Depot. Linn’s Archives at the left is named after the late Model Railroader Editor Linn Wescott. A construction article on the Leming Compressed Gas Co. appeared in the March Model Railroader Magazine. This view was photographed in September, 1969. * 4280 x 2840 * (4.07MB)

s1_031_detritus_sep69 * Findley’s Detritus and Fenton Produce, one of the fifteen industries in and around Andrews. * 4264 x 2888 * (4.16MB)

s1_032_ssuaw29_jun70 * Down in the lower elevations of Giant Canyon, 2-8-0 #29 drifts into Squawbottom Station. * 4272 x 2896 * (4.6MB)

s1_033_29cold_jul71 * July of 1971 finds 2-8-0 #29 rumbling across the Squaw Creek High Bridge over Squawbottom Creek after passing thru the short tunnel at Eagle’s Nest. In the distance is the always snowed-in Cold Shoulder. * 4272 x 2880 * (4.43MB)

s1_034_bridgesquaw_jul71 * 0-6-6-0 #35 is high above Squawbottom Depot on the Scalp Mountain Arch while the still incomplete narrow gauge line at the left waits for completion and some traffic. * 4272 x 2832 * (4.61MB)

Click for the original image
 
s1_035_25bridge_feb72.jpg - 4272 x 2888 - (4.45MB)
Download file (4.45MB)
8/8/06 6:19 PM
s1_036_sqwbtmcrk_sep64 * September of 1964 finds 4-6-2 #50 with a local passenger train in tow crossing the concrete viaduct over Squawbottom Creek. The middle track is a stiff 3 1/2% grade while the top track leads to the town of Akin. * 4272 x 2888 * (5.03MB)

s1_037_35bridge_feb72 * Having left Cold Shoulder, 0-6-6-0 #35 trundles across the Scalp Mountain Arch spanning Squawbottom Creek. Squawbottom Depot and the surrounding buildings can be seen at the lower left. * 4280 x 2864 * (4.47MB)

s1_038_dividevening_feb72 * Early evening at Great Divide. Commuters wait patiently for the arrival of their train while the Superior Bakery works around the clock. Look carefully and you will see where the mirror surface touches the roof and tracks. * 4272 x 2840 * (4.23MB)

s1_039_25bridge_feb72 * 2-6-0 #25 and a short freight heading up to Cold Shoulder (in background) on a spidery steel arch bridge below Eagle’s Nest. * 4224 x 2920 * (3.71MB)

s1_040_herald_feb72 * The Bi-level depot at Cross Junction and the yards at Great Divide. * 4272 x 2840 * (4.08MB)

Album last updated on 8/16/06 7:36 PM
"John Allen's Gorre and Daphetid Railroad" Copyright 2006 Peter T. Prunka all rights reserved