HOME  »  Gorre and Daphetid Railroad - The Slides » Set_00 »  Viewing s0_026_roundconst_july59     [Image 26 of 108]  :: Jump To  
  First slide Previous slide      Index Page Start/Stop the slide show      Next slide Last slide  
Comment: From Port looking toward Angels Camp. The harbor bridge is now two tracks wide.
s0_021_perspective_july59 * View from above Daphetid looking toward Cross Jct. with the first depot at the Jct. The clock is in place. * 3072 x 2048 * (2.48MB)

s0_022_scalp_july59 * Sim’s Loop and Texas Draw scenery about finished. Note 'Nika' at upper right. * 3072 x 2048 * (1.82MB)

s0_023_bridge_july59 * View down Sowbelly Creek (?) from the aisle. Future logging scene on spur at lower right. * 3072 x 2048 * (2.27MB)

s0_024_teaby_unk59 * East end of Gorre – Oil drilling rig at Sowbelly is just below the through truss bridge. Daphetid at left * 3072 x 2048 * (2.33MB)

s0_025_crevas_unk59 * Working hard with plenty of smoke pulling upgrade on the 3.5 percent dual gauge just east of Squawbottom. * 3072 x 2048 * (1.66MB)

Click for the original image
 
s0_026_roundconst_july59.jpg - 3072 x 2048 - (2.32MB)
Download file (2.32MB)
8/8/06 2:49 AM
s0_027_mountains_may61 * Looking up Devil’s Gulch. Sims Loop small bridge and tunnel on left. * 3072 x 2048 * (2.14MB)

s0_028_silverbrigde_may61 * The Truss Bridge over Port harbor west of Great Divide * 3072 x 2048 * (1.46MB)

s0_029_general_may61 * A distant view of Devil’s Gulch. Daphetid and Scalp Mt. in center * 3072 x 2048 * (1.88MB)

s0_030_clock_may63 * The clock and Cross Jct. with station and coal trestle. Note reflection of freight house at right, soon to be blocked by Depot and G&D headquarters building. * 3072 x 2048 * (2.56MB)

s0_031_clock_may63 * Another exposure of slide 030 * 3072 x 2048 * (2.18MB)

Album last updated on 8/16/06 7:35 PM
"John Allen's Gorre and Daphetid Railroad" Copyright 2006 Peter T. Prunka all rights reserved